Affordable Sturdy Sheds

December 15, 2011

Right now, we are offering a rent to own program.  For $99.00 per month, you can get a great shed with sky lights and

When a shed is full, the windows are blocked, so there is no light.  We use sky lights.

This sturdy shed or one bigger can be yours.

ramp.  Unlike a storage locker, in time you own the unit.  With just three hundred dollars down payment, a most useful conveniently located storage unit could be in your back yard by next week.  No state or county permits are necessary.  If you live in a Home Owners Association, we will leave those details up to you. Unlike pre-made sheds, your shed will be built on strong  2×6 joists with a 3/4 inch treated floor board, custom built for your location and you can watch our quality workmanship.  This offer ends March 1, 2012.

Right the First Time Contractors New Email Address

December 8, 2010

We have a new email address. It is r1tcontractor@gmail.com. Please address all queries to this email address or to  (540)846-6013.

20% Discount on Basement Renovations! (limited time)

October 30, 2010

Now is the time to make use of your unfinished basement. Christmas is right around the corner and many families don’t have enough room to accommodate relatives when they come visiting for the holidays. The basement would be a perfect place to add an extra bedroom or  two, or a game room, or home theater to entertain your friends or/or relatives.

We have the solution for you!  Right the First Time can help with most of your basement renovations. New Customers will receive a 20% discount on basement renovations from now through November 31st, 2010. Customer must live within 10 miles of zip code 22407.  Call (540)207-2584 to order your dream space today!

This slideshow requires JavaScript.

Pressure wash and stain your deck before winter…

October 20, 2010

A powerful (at least 2700 PSI and 3 gpm) power-washer and a good staining will preserve your deck and save you the money of replacing your deck.  If cash is low, there is an option that will help a lot.  If you can’t afford to have your whole deck done, at least have the horizontal pieces pressure-washed and stained.  I’m referring to the top of the rail and the floor.  The top of the rail and the floor take a huge majority of the beating of winter.

We will also take care of warping boards, nails popping out, and replace boards if necessary.

This slideshow requires JavaScript.

Just some quick thoughts about hiring shed, fence, deck, or home improvement companies…

September 30, 2010

It has been my experience, the larger the company, the “smaller the quality”.  I am a part-time pastor and run this business out of my garage.  I 

It is hard to find white work boots...

have five workers, who are mostly in their twenties, either working their way through college or trying to to save up money to go after their dreams.  Most of them go to my church.  I have trained them all, accept for two of them.  These two have a great deal of experience and have the same work ethic I do.  We don’t make “short cuts”.  I’m cursed with being a perfectionist.  I need money to live, but I take more pleasure in a job well done.

Shed we built:

September 28, 2010

Wood Deck we built

September 28, 2010

Pics of our work for realtors:

September 28, 2010

This slideshow requires JavaScript.

Synthetic Deck

June 9, 2008

This slideshow requires JavaScript.


Follow

Get every new post delivered to your Inbox.

Join 277 other followers